Ground Improvement for New Jersey Turnpike Interchange 14A Improvements: A Case Study
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

Construction of embankments up to 34 ft in height for twelve ramps and roadways needed for the New Jersey Turnpike Interchange 14A project required ground improvement. The subsurface conditions, consisting of up to 30-ft thick layer of highly-compressible peat and organic soils, would induce up to 8 ft of primary and 4 in. of secondary consolidation settlements to the embankments over a long period of time. Innovative ground improvement solutions were needed to meet unique challenges posed by the poor subsurface conditions, space and existing utility constraints, aggressive construction schedule, and massive size of the project. A variety of ground improvement techniques were utilized in six different zones of the embankments to limit settlements and ensure stability of the embankments. These techniques included preloading with surcharge and prefabricated vertical drains (PVD), load balancing using light weight fill, and concrete column rigid inclusions (RI). Additionally, augercast piles with load transfer platform were used under an existing bridge with low vertical clearance. An innovative approach consisting of preloading with surcharge and PVDs followed by installation of RI was needed in one of the six embankment zones with the worst, i.e., very soft, soil conditions. The design of the RI was performed by a specialty ground improvement contractor (SGIC) using Plaxis 2D and 3D softwares. The performance of the ground improvement systems was verified and monitored by load tests and instrumentations. This paper presents details of the ground improvement design, construction, monitoring results, and lessons learned, with a focus on the RI.

Subjects: rigid inclusions, soil consolidation, settlement control

Author: Shafiq I. Siddiqui, Daniel V. Cacciola, Sarah Ramp, Faisal Ahmed and Justin Labrozzi

Publisher: DFI

Annual Conference Proceedings
Powered By