Landfills often cover expansive areas in locations where large building facilities or infrastructure is in high in demand after the land has been reclaimed. Most landfills have soil or fill properties that vary widely over small distances; combined with the strict guidelines and restrictions for the removal and treatment of soil or material that is on site, these projects can be a major challenge for any prospective developer. In order to make landfills suitable for the construction of any project it is necessary to conduct a detailed evaluation of the subsurface conditions. Ground improvement techniques are among the most typical methods for making reclaimed landfills suitable for the construction of any major project. The paper will discuss the approach that was taken to support a proposed warehouse in Elizabeth, New Jersey using Controlled Modulus Columns Rigid Inclusions (CMC Rigid Inclusions), which are grouted, auger-displacement elements. Additionally, we will discuss the use of Dynamic Compaction (DC) that was performed in areas outside the proposed warehouse footprint. Through the combination of CMC rigid inclusions and DC, the general contractor's project schedule was expedited, the costs to support the warehouse were economized, and the anticipated settlement of the parking lot areas was drastically reduced. Furthermore, the paper will outline the benefits of using CMC rigid inclusions and DC methods in order to minimize the impact of working with contaminated soils from a landfill.
Subjects: helical piles, lateral load, pile testing, foundations, headroom, pipe racks, non-building structures
Author: William W. Haasz, Brandon T. Buschmeier, Steve E. Darnell and Frederic Masse
Publisher: DFI