Hydrocutter-Excavated Slurry Wall for Center Hill Dam Foundation Remediation
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

Center Hill Dam is a critical part of the infrastructure controlling floods at the Caney Fork River and reducing flood levels at the Cumberland, lower Ohio and Mississippi Rivers. The Center Hill Dam Foundation Remediation Project was necessary to address Karst features in the foundation rocks and observed signs of distress of the dam. From 2011 to 2014 BAUER Foundation Corp. (BFC) performed deep foundation works for this project. The executed features of work include the installation of two walls. The first wall extends throughout the clay embankment into the underlying rock to provide encasement during the construction of the second wall. Its width of 7.4 feet makes it the widest diaphragm wall ever installed. The second wall is the actual seepage barrier and provides a continuous 2-feet wide wall. It extends through the first wall into the underlying rock and is up to 300 feet deep. The paper introduces the project, the requirements specified by United States Army Corps of Engineers (USACE) for encasement and barrier wall and the approaches taken by BFC. It discusses the ground conditions and describes the excavation equipment as well as the excavation methods used. A special focus is put on the steering capabilities of the hydrocutter equipment and the verticality performance.

Subjects: underground parking facilities, deep excavation, sinking caisson

Author: Michael Arnold, Bob Faulhaber and Joe Nichols

Publisher: DFI

Annual Conference Proceedings
Powered By