IMPROVED DRAINAGE BY DRILLED FILTER DRAINS, DAM SAFETY UPGRADE, CASE STUDY
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

The embankment dam at Storfinnforsen is 23 m high and was completed in 1954. The dam has an impervious zone with timber sheet piles and a support fill of glacial till. The pore water pressure in the downstream shoulder has during recent years increased du

Subjects: dam safety, upgrade, internal erosion, drains

Author: Åke B. Nilsson, Carl-Oscar Nilsson

Publisher: DFI

Annual Conference Proceedings, International Conference Proceedings
Powered By