Abstract:
Advances in computer interface technologies have provided the opportunity to enhance the current state of the art in computer monitored grouting. Level 3 Advanced Integrated Analytical Systems (AIA Systems) for grouting continue to evolve by employing three-dimensional interface ‘ engines’ that allow operations personnel to be immersed into a virtual representation of a project site. This enhances the understanding of spatial relationships between grouting operations, geotechnical sensors, equipment, batch plants, and subsurface entities like geological features, dam conduits, or existing boreholes. A complete real-time understanding of the spatial relationships of all entities on a project site is fundamental for the effective coordination and analysis of project activities. An intuitive three-dimensional interactive graphical user interface (GUI) provides control and monitoring of real-time information, ensuring operations are completed with a high level of accuracy and risk mitigation. This paper will detail the features of this new type of GUI as well as compare and contrast legacy Level 3 grout monitoring systems against a system that employs an interactive virtual 3D environment through real-world scenarios.