The Route 6 /10 10 Interchange Design/Build project, located in Providence, Rhode Island, involves the design and construction of five (5) new elevated bridge structures to replace and reconfigure the existing interchange and to provide a link between Route 10 northbound and Route 6 westbound. Due to site logistics, headroom restrictions, and depth to bedrock, 50 ton drilled micropiles installed in the deep medium dense sand strata were initially proposed as the deep foundation solution. Post project award, Geosciences Testing and Research, Inc. (GTR) performed various analyses and developed an alternate driven pile solution using steel Tapertube. The results of these analyses indicated that driven steel taper tube and steel pipe piles could develop greater capacities than the drilled micropiles in the granular soil
layer, thereby reducing the number of foundation elements, decreasing construction schedule and providing a more cost effective foundation alternative.
A comprehensive driven pile load test program was subsequently executed by GTR and the Design Build Team led by Barletta Heavy Division of Canton, Massachusetts, to assess the performance of Tapertube and steel pipe piles, including pile drivability, load-deformation characteristics under static and dynamic loading, and to develop site-specific design parameters in two (2) distinct test areas. The test pile program included dynamic, static compression, tension and lateral load tests on each test pile. Load test
measurements were automated with embedded Vibrating Wire Strain Gages (VWSG) to measure load transfer with depth. The execution and results of the successful pile load test program are presented and offer unique case study and valuable data for the use of Tapertube piles on deep foundation projects in the New England region.
Author: Seth H. Hamblin, P.E., Leo J. Hart and John E. Regan, P.E.