A hybrid shoring system consisting of cast-in-place soldier piles with Cutter Soil Mixing (CSM) infill panels was constructed for temporary support of a 19.8 m (65 ft) deep excavation in Vancouver, British Columbia, Canada. Deep Mixing (DM) was completed up to 9.7 m (32 ft) in fill, peat, wood waste and clayey silt with embedment in dense till, and soldier piles constructed through the dense till extending to below final excavation level. Two trial CSM panels were installed ahead of production to assist with developing the termination criteria of the CSM panels in the dense till. The constructed depth of the CSM panels was based on interpretation of real-time monitoring data obtained through the Bauer B-tronic system. Inclinometer monitoring data from two CSM panels and two soldier piles, as well as soldier pile survey target data was used to assess and monitor the performance of the hybrid shoring system throughout bulk excavation. The objectives of this paper are to provide an overview of the design and construction aspects of the hybrid DM shoring system and to present inclinometer and pile target data to demonstrate the lateral performance of the CSM infill panels and soldier piles. This paper also discusses the merits of using real-time monitoring data as part of the engineering decision-making process for validating CSM panel construction.
Subjects: lateral behavior, pile group, vertical pile, battered pile, soil resistance, finite element analysis
Author: Marina S. W. Li, C.Eng., P.Eng., Nadir Ansari, P.Eng., D.GE. and Brian W. Wilson, C.Eng., P.Eng.
Publisher: DFI