Jet Grouting for Groundwater Cutoff at Tie-in between Existing Tunnel and New Construction
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

This paper describes an innovative case history of using jet grouting to form a groundwater cutoff wall at the interface of a cut-and-cover construction and an existing tunnel. The design of the jet grouting layout was complicated by the presence of a lef

Subjects: tunnel, jet grouting, groundwater cutoff, tunnel, grout panel, grout column

Author: Chu E. Ho, Aaron Evans, Tom Richards

Publisher: DFI

Annual Conference Proceedings, International Conference Proceedings
Powered By