KLCC L&M Tower - Foundation Piles XXLConstruction of the Actually Deepest Foundation Piles Ever Done by the Kelly Method in Kuala Lumpur / Malaysia
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

Abstract:

The Tower of Lot L, L1 & M at Kuala Lumpur’s City Centre when completed will stand 700m tall. This mega tall Skyscraper would merely be less than 500m away from the famous Petronas Twin Tower. From June 2018 to February 2020 BAUER (MALAYSIA) SDN. BHD. constructed 225 bored piles with diameters of 2.0m and 2.5m for this tower and podium arrangements. To comply with the depth requirement of the initial design and the need to have the pile toe ending 2.0m above competent bedrock, the drilling equipment needed to be able to achieve a maximum drilling depth of 150m by the client. Finally, the deepest piles constructed on site were as deep as 125m. These dimensions caused superlative challenges which included but were not limited to, controlling the open borehole stability over time with polymer slurry, installing up to 70tons heavy steel cages and pouring up to 550m³ concrete continuously in conjunction with installation of 88t kingposts into workable fresh concrete. The piling works were executed with a BAUER BG 48 and the newly developed BAUER BG 72, the biggest rotary drilling rig globally available.
KARSTEN; Dr.-Ing. KARSTEN BECKHAUS; Mr. VIJAY VIRAMUTHU
International Conference Proceedings
Powered By