LOAD TESTS ON DRILLED SHAFTS AT GOETHALS BRIDGE REPLACEMENT
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

The Goethals Bridge Replacement (GBR) spanning the Arthur Kill Waterway between Elizabeth, NJ and Staten Island, NY is supported on over 200 drilled shaft foundations ranging in diameter from 4.5 ft to 10 ft and socketed into Passaic Formation siltstone.

Subjects: drilled shaft, bridge foundations, load test, axial, lateral, bi-directional, Statnamic, rock socket highest

Author: Steven S. Dapp, John P. Turner, Dan A. Brown,

Publisher: DFI

Annual Conference Proceedings, International Conference Proceedings
Powered By