Large Diameter Auger Cast Piles at Audi Field, DC United's New Soccer Stadium
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

D.C. United, the professional soccer team located in Washington, D.C., completed a 20,000 seat capacity stadium in July 2018 named Audi Field. The project initially considered a foundation system consisting of roughly 800 prestressed concrete driven piles configured in groups with pile caps. A value engineering alternative proposed in a design-build manner ultimately resulted in the use of 300 single element Auger Cast Piles (ACPs) for the foundation system. The ACPs ranged between 1.5 ft and 4 ft in diameter, were up to 85 ft in length, and were connected through a system of grade beams to accommodate large lateral induced loads. Limitations in conventional analytical methods were encountered during the structural design of the piles due to the complexity of the lateral loading and pile fixity conditions. An innovative approach using advanced finite element modeling that incorporated the framing effects of the grade beams was required to meet the strict movement criteria despite large lateral loads.

Christophe H. Locussol

Keywords: large diameter auger cast pile, lateral loads, numerical modeling, partial head fixity

Publisher: DFI

Annual Conference Proceedings
Powered By