Deep foundations were required for construction of an 18, 000 ft2 (1, 672 m2) 4-story office building and an adjacent 23, 750 ft2 (2, 206 m2) 5-story parking garage in Queens, New York due to an existing uncontrolled fill layer ranging from 15-20 ft (4.6 - 6.1 m) in thickness beneath the building footprint. The geotechnical engineers for the project initially selected auger cast-in-place (ACIP) piles over driven piles to limit the impact of noise and vibrations on the surrounding neighborhood. Ultimately, drilled displacement piles (DDP) were installed since this method offered a more economical solution that would generate the required pile capacity with shorter drill depths and would also mitigate spoils volume. During installation of test piles by the geotechnical contractor retained for the foundation work, multiple unanticipated soil conditions were encountered that would adversely affect the constructability of the piles. The existing fill contained significantly more natural and manmade obstructions than expected and the underlying glacial soil became too dense to penetrate at shallower depths than anticipated. This paper discusses how these issues were overcome through pre-drilling and the use of detailed instrumented test pile data coupled with in-house engineering capability to proactively re-evaluate minimum pile lengths at any given location and keep the project on track.

Subjects: constructability, drilled displacement pile, augered cast in place piles, deep foundations, load testing, urban fill

Author: Yaser Taheri, P.E., A. Rod Kern and Michael A. McNicholas, P.E.

Annual Conference Proceedings
Powered By