The Lower Wood River Levee system, at the confluence of the Wood River Creek and the Mississippi River, in East Alton, Illinois, has been plagued with underground seepage and, in 2010, remediation was deemed necessary by the Southwestern Illinois Flood Prevention District Council and the United States Army Corp of Engineers (USACE). The experts enlisted by the council produced a design that provided for constructing a cutoff wall approximately 2, 000 feet long and up to 140 feet deep, through alluvial and outwash soils, and embedded in bedrock. This paper will describe the challenges faced by the Quality Control (QC) and Quality Assurance (QA) teams due to the complex nature of the project in conjunction with an extremely thorough QC/QA program.
Subjects: Settlement, Non-linear Stress-strain, CPT Records, Soil Behavior Classification, Case Histories
Author: Matteo Bertoni, Raffaella Granata and Wesley Schmutzler
Publisher: DFI