Overcoming the Challenges Endured by the Quality Assurance and Quality Control Teams during the Construction of a Deep Cutoff Wall in East Alton, Illinois
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

The Lower Wood River Levee system, at the confluence of the Wood River Creek and the Mississippi River, in East Alton, Illinois, has been plagued with underground seepage and, in 2010, remediation was deemed necessary by the Southwestern Illinois Flood Prevention District Council and the United States Army Corp of Engineers (USACE). The experts enlisted by the council produced a design that provided for constructing a cutoff wall approximately 2, 000 feet long and up to 140 feet deep, through alluvial and outwash soils, and embedded in bedrock. This paper will describe the challenges faced by the Quality Control (QC) and Quality Assurance (QA) teams due to the complex nature of the project in conjunction with an extremely thorough QC/QA program.

Subjects: Settlement, Non-linear Stress-strain, CPT Records, Soil Behavior Classification, Case Histories

Author: Matteo Bertoni, Raffaella Granata and Wesley Schmutzler

Publisher: DFI

Annual Conference Proceedings
Powered By