Performance Based Excavation Support Design for Challenging Urban Site Geometry in Toronto, Canada
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

Abstract:

The EQ Bank Tower, a 24-storey office tower with 4 levels of underground parking, is currently under construction at 25 Ontario Street in the downtown core of Toronto, Canada. The tower geometry required an 18 m (60 ft) deep excavation inside an existing 3-storey 100-year-old façade, to be retained in place throughout construction. This presented a variety of design challenges that required several innovations and a customized monitoring program. In this paper, we will discuss two major challenges, and highlight the innovative and adaptable solutions carried out using performance-based design leveraging the observational method. The first was installation of a shoring system in a 500 mm (20 in) gap between the historical façade and a live gas main. The second involved excavating 10 m (33 ft) into expansive shale bedrock adjacent to a sensitive neighbouring building.

ERIKA; Ms. ERIKA ACTON
Annual Conference Proceedings
Powered By