The Permanent Canal Closures and Pumps (PCCP) project is the capstone piece of New Orleans’ extensive hurricane risk-reduction system constructed following Hurricane Katrina. The project consists of three discrete pump stations and flood gates on the shore of Lake Pontchartrain which provide a storm surge barrier and pump rainwater from the City of New Orleans’ primary drainage canals. The depth of the pump station structures ranged between 39 and 45 feet below sea-level. USACE developed the PCCP project for design-build delivery; granting the project team latitude to develop innovative, cost effective solutions for the project. The use of OPEN CELLTM cofferdams to construct the pump station structures was one such innovation. OPEN CELL structures utilize the strength of the retained soil to anchor cellular sheet pile face arcs; allowing a free-field of construction within the cofferdam. This cofferdam design did not require ground improvement or dewatering around the perimeter of the cofferdam. The free-field cofferdams streamlined construction and large equipment installation within the structures with no encumbrance from internal bracing. Meticulous force-based design, soil-structure numerical modeling, and physical testing were all techniques used to present and gain USACE acceptance of the design on this vital element of the work.
Subjects: Large diameter cylinder pile, PSC pile, Pipe pile, open ended pile, Statnamic load test, High strain dynamic load test, CAPWAP, Pile setup
Author: Matthew Anderson, King Chin, Mike Huggins, Ryan Higbie, Rian Johnson and Dave Sinsheimer
Publisher: DFI