Permanent Earth Retention for Deep Excavation Installed Within Minimal Right of Way Limits
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

Construction of a new underground parking structure in State College, Pennsylvania, is situated on a site constrained by limited ROW and required excavations ranging in depth from 25 ft to 40 ft. Additional complications included busy surface streets, an active intersection, and numerous underground utilities that could not be disrupted by construction activities. To combat these challenges, an innovative approach for earth retention was designed that combined multiple types of retention systems. The overall system included alternating sections of soil nail walls and a hybrid system of soldier pile walls (consisting of micropiles) that were partially restrained by a soil nail wall in the lower portions of the excavation. Further, due to the limited space within the property limits that inhibited the length of the permanent nails, the wall design team collaborated with the project designers to develop a solution such that the completed wall became an integral part of the final design/construction of the underground parking structure.

Author: Christopher J. Ramsey, P.E. and Thomas D. Humbert, P.E.

Annual Conference Proceedings
Powered By