ROCK SOCKETED DRILLED SHAFTS FOR THE GOETHALS BRIDGE REPLACEMENT
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

The Goethals Bridge Replacement (GBR) spanning the Arthur Kill Waterway between Elizabeth, NJ and Staten Island, NY consists of a dual-span 1, 982.5-ft long cable-stayed bridge with approach spans of 2, 545 ft on the NJ side and 2, 788 ft on the NY side. Th

Subjects: drilled shaft, bridge foundations, load test, axial, lateral, bi-directional, Statnamic, rock socket

Author: John P. Turner, Steven S. Dapp, Dan A. Brown

Publisher: DFI

Annual Conference Proceedings, International Conference Proceedings
Powered By