The Skanska/Kiewit/ECCO III team (SKE) in association with HNTB was awarded the design-build contract for Phase I of the Kosciuszko Bridge Replacement Project. As lead designer for the SKE team, HNTB was responsible for the design of the Brooklyn Connect

Subjects: Kosciuszko Bridge, T-Wall®, CPT, settlement, elastic modulus, shear modulus, construction monitoring, automated total stations

Author: Britain A. Materek, M.D. Riegel, P.B. Piazzimenti, E.M. Zamiskie