Risk control of deep permeation grouting by determination of grout volumes based on the monitoring and observational engineering
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

As part of the Schiphol-Amsterdam-Almere project, the largest aqueduct in Europe is being built in order for the A1 motorway to cross the Vecht river. The A1 consists of 12 lanes and the total width of the aqueduct will be 65 m (213 ft). The total length

Subjects: Keywords: grouted layer, execution deviations, probabilistic model, seepage, visualizing multiple grouting

Author: Bartho J. Admiraal, Falco A. van Dijck

Publisher: DFI

Annual Conference Proceedings, International Conference Proceedings
Powered By