TBM Recovery Shaft Construction- SR-99 Tunnel
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

The 17.4 meter (57 ft) diameter tunnel boring machine (TBM), the world’s largest at the time of her launch in 2012, locally referred to as “Bertha, ” is stuck. Incapacitated due to mechanical failure approximately 36 meters (120 ft) beneath downtown Seat

Author: John Starcevich, Lance Rasband, Richard Hanke

Publisher: DFI

Annual Conference Proceedings, International Conference Proceedings
Powered By