The paper describes the adopted technologies and performance controls related to a special geotechnical engineering solution provided within the scope of the Galataport Project, in Istanbul, Turkey. The scheme is the one applied to the new quay of Salipazari, which is a combination of retaining structure and ground improvement, formed by a combi-wall, a reinforced concrete diaphragm wall and a soil improvement by deep soil mixing (Turbojet). The paper highlights the importance of employing cutting-edge technologies within the foundation engineering field and state-of-the-art electronic control devices, in parallel with the essential human expertise, in order to obtain the desired results in this high profile Project. The results of the in-situ and laboratory tests carried out on the improved soil are also presented.