Construction of the University at Buffalo’s new School of Medicine and Biomedical Sciences (UB-SMBS) required excavation in variable ground to a depth of more than 40 ft adjacent to the NFTA Metro subway and Allen Street Station. Complicating the building
Subjects: deep excavation, micropiles, groundwater control
Author: Walter E. Kaeck, Lisa R. Papandrea, David Chen
Publisher: DFI