New York City is an urban environment with a history spanning over 200 years. The coastline of New York has changed over the years. In the East River, old bulkhead and remnant of relieving platforms together with variable bedrock elevations pose challenges in the design and construction of deep foundations. This paper presents a Case History of high capacity deep foundations along the Franklin D. Roosevelt (FDR) Drive on the Upper East Side in New York City. The project consists of a ramp that overpasses the FDR Drive allowing heavy trucks to access the Marine Transfer Station (MTS) facility built over the East River. Large diameter drilled shafts and mini-piles socketed to bedrock were designed and constructed. Remnant of old bulkhead was encountered at the site and a Ground Penetrating Radar (GPR) investigation was completed during the subsurface investigation phase of the design. This paper discusses details of the subsurface investigation program and design methodology of the high capacity drilled shafts and mini-piles. It also describes construction methods and results of Osterberg Load tests documenting the field values of skin friction through the rock socket. Other construction challenges include construction and drilling rock sockets for drilled shafts over sloping bedrock.
Subjects: deep foundation, drilled shafts, minipiles, design, construction, challenges, case history
Author: Gisele R. Passalacqua, Joanna Smith and Karen C. Armfield