A new 50 MW biomass renewable energy power plant was planned for construction in southwestern Georgia. The original foundation design consisted of very conservatively designed H-pile groups with vertical and battered piles to carry the axial and lateral l
Subjects: value engineering, risk mitigation, H-pile, karst, soil setup
Author: Daniel J. Woeste, Rachael M. Fischer, Terence P. Holman
Publisher: DFI