WILLOW ISLAND HYDROELECTRIC PROJECT: TAMING THE OHIO RIVER TO CREATE GREEN ENERGY
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

Construction of the powerhouse for the Willow Island Hydroelectric Project, located atthe Willow Island Lock and Dam, required a 120-ft deep temporary excavation inside the limits of a cellular cofferdam on the Ohio River side of the excavation and a

Subjects: excavation, river, cellular cofferdam, soft rock geology, stability, deep rock cut, dewatering system

Author: James M. Tantalla, Roderic A. Ellman, Jr.

Publisher: DFI

Annual Conference Proceedings, International Conference Proceedings
Powered By