Westlink Projects – Geotechnical Challenges During the Execution Phase
Availability
On-Demand
Cost
$0.00
Credit Offered
No Credit Offered

Abstract:

The West Link is a double track railway project currently under construction in Gothenburg, Sweden. The project includes the construction of 8 km of track, 6 km of which will be in tunnels. Next to several large excavations three new stations will be built: Centralen, Haga and Korsvägen, all within the city of Gothenburg. The first construction phase of the project began in May 2018, and the finalization of the project is expected for 2026. The project is divided into five sections. Keller is involved in four of these contracts assisting the special foundation works with various geotechnical techniques including Dry deep soil mixing (DDSM), jet grouting, rock grouting, uplift piles, sheet piling and rock dowels since the design & planning phase in 2018. The core idea behind successful collaboration has been to apply the right product for a location specific challenge which can help optimise costs & time for the project with a minimal environmental impact. Due to the extensive nature of the project, a teamwork of experts from various locations around the world is helping design and execute various foundation technologies and to provide solutions to the practical challenges in the project like working close to existing structures, rail lines, river etc.
ROBERT; ROBERT THURNER; Dipl.-Ing. Andreas Körbler
International Conference Proceedings
Powered By